A facilities manager can't approve a lighting spend from a photo. This is the document that answers “will this overload our panel” and “what does it cost to run” — in a form you can forward to whoever signs.
Branded, dated, and versioned — built from your property's actual measurements, not a template.
Total connected load and amp draw per circuit run
Panel headroom assessment against your stated available capacity
Circuit distribution plan
Incandescent vs. LED comparison: watts, kWh over the season, and operating cost delta
Stated methodology and assumptions, including what was measured vs. estimated
Scope, dates, and takedown schedule
Branded, dated, and versioned document you can forward to whoever signs off
Figures below are illustrative only, not a real property — your report is built from measurements taken at your site.
Jolly Raleigh Commercial
Load & Energy Report
It depends entirely on the property — total fixture count, LED vs. incandescent, and run length all drive the real number. That is exactly what the Load and Energy Report calculates for your specific property instead of a generic estimate.
Not when it is planned against your actual available capacity. We measure connected load and amp draw per circuit run and design the installation to stay inside your panel headroom before any lights go up.
LED fixtures typically draw a fraction of the wattage of incandescent for the same visual effect. The report includes a watts, seasonal kWh, and operating cost comparison specific to your property so you are not estimating from a national average.
It is a document that answers the two questions a facilities manager gets asked before signing off on a lighting spend: will this overload our panel, and what does it cost to run. You can forward it to whoever approves the budget without translating it yourself.
No — we do not use the word "certified" unless a licensed Professional Engineer or certified energy manager has stamped the document. What we provide is a detailed, methodology-stated report from our own measurements and assumptions, clearly marked as such.
Submit the request form below and we will follow up within one business day to schedule a site assessment and scope the report.
No pitch, no obligation — just the numbers your budget approval needs.
No pitch, no obligation. We'll get back to you within one business day.